• REQUIREMENTS FOR COMPLETING SIMULATION OF A SPACE AND PROVIDING BASELINE QUOTE

  • broken image
    Ideal List of Information to be Received from Customer by COLighting Teams to Process Simulation and Quote for a Customer Having a COMMERCIAL OFFICE TYPE SPACE:
    • AutoCAD (*.dwg) File of the Room/Area/Space

    • Lighting Plan/Scheme for current Lighting Fixtures in the Room/Area/Space

    • Pictures or Video of the Room/Area/Space

    • Height from the Floor to the Bottom of the Current Lighting Fixtures

    • Height of Interior Elements (Tables, Furniture, Machinery, Shelves, etc.) within the Room/Area/Space

    • Manufacturer and Model Number of the Current Lighting Fixtures

  • Retail Space

    Warehouse Space

  • broken image

    Restaurant Example

    Total SqFt – 3,000

    Fixture Type: Juganu J.Protect Presto C Series (2x2 Ceiling Tiles) (JMIX + UVC)

    Total Fixtures – 46

     

    Energy Savings : 50%+ (if traditional ballast type fixtures being replaced)

     

    Price per Day for all Fixtures INCLUDING SaaS (Software as a Service/84 Months), Assuming a Financing of 10% @ 84 months, price per day came to $21 (NOTE: Assuming a Cost of Sales of 60%, then revenue per day to cover cost of solution is $52 per day)

     

    Full Replacement Guarantee – 7 Years

     

    NOT INCLUDED: Shipping from Factory to Customer Location or Installation of Fixtures

    broken image

    Office Space Example

    Total SqFt – 5,000

    Fixture Type: Juganu J.Protect Presto C Series (2x2 Ceiling Tiles) (JMIX + UVC)

    Total Fixtures – 77

     

    Energy Savings : 50%+ (if traditional ballast type fixtures being replaced)

     

    Price per Day for all Fixtures INCLUDING SaaS (Software as a Service/84 Months), Assuming a Financing of 10% @ 84 months, price per day came to $1.04 per Employee per Day (NOTE: Assuming Space per Employee of 150 sqft or 33 Employees within 5,000 sqft Space)

     

    Full Replacement Guarantee – 7 Years

     

    NOT INCLUDED: Shipping from Factory to Customer Location or Installation of Fixtures

    broken image

    Hospital Space Example

    Number of Floors/Stories of Hospital Building: 5

    Total Patient Rooms in Entire Hospital Building: 100

    Fixture Type: Juganu J.Protect Presto S Series Fixtures (JMIX + UVC)

     

    Number of Fixtures per Room Average: 5 (Bathroom x 1, Entry x 1, Room x 3)

    Price per Room for all Fixtures INCLUDING SaaS (Software as a Service/84 Months), Assuming a Financing of 10% @ 84 months, price per day per room came to $2.78 per Day per Room

    CALCULATION NOTES:

    Calculation INCLUDES per Fixture Allowance for Installation of $150

    Calculation is for Rooms Only, Does NOT Include Fixtures in Common Areas of Total Space

     

    Full Replacement Guarantee on Fixtures – 7 Years

     

    NOT INCLUDED: Shipping from Factory to Customer Location

    broken image

    Horticulture or

    Greenhouse

    Total SqFt – 125,000

    Fixture Type: Juganu LiquidoTop

    Total Fixtures – 2,000

     

    Energy Savings – 35%+ (50%+ with Juganu Natural Light to Required Light Load Balancers Option)

     

    Increase in Crop Turns per Year: 2

     

    Higher Potency: 3-50%

     

    Over Quality of Crop Increase: 50-60%

     

    Price per Month for All Fixtures, Assuming Financing of 10% @ 84 months, $31,712

     

    Increase in Revenue to Farm: $9.4m (Hemp Seedling Use Case)

     

    Full Replacement Guarantee – 7 Years

     

    NOT INCLUDED: Shipping from Factory to Customer Location or Installation of Fixtures